Construction on Rte31 1 year, 3 months ago #3104

Traveled on 31 today and.....

they are working on the bridge and have closed it between Statebridge and Route 316? on 31....there is a detour which is maybe an extra 5- 7 miles around it by following the signs (thru durhamville and such)

Anyone coming on Rte 31 from Utica, Rome or Vernon may want to give themselves an extra few minutes travel time...just thought I'd pass this on!

Dick Aversa
The following user(s) said Thank You: ron, tummy

Re: Construction on Rte31 1 year, 3 months ago #3107

  • estapete
  • OFFLINE
  • Administrator
  • Posts: 288
Thanks for keeping everyone informed Dick, much appreciated.
Pete
The following user(s) said Thank You: tracman466

Re: Construction on Rte31 1 year, 3 months ago #3111

  • tummy
  • OFFLINE
  • Bounty Hunter
  • Posts: 88
I wonder if it would be quicker if you were coming from Rome, to go through the beach?
The following user(s) said Thank You: tracman466

Re: Construction on Rte31 1 year, 3 months ago #3112

  • ron
  • OFFLINE
  • No Time 2 Race
  • Posts: 282
should get you around it thru rome out 49 I think , it comes out at the save on , that's after it im pretty sure ???

Re: Construction on Rte31 1 year, 3 months ago #3114

It's only an extra 5-10 minutes thru the detour if traffic is normal guys

Re: Construction on Rte31 1 year, 3 months ago #3115

  • tummy
  • OFFLINE
  • Bounty Hunter
  • Posts: 88
You guys are both right, always overthinking. God forbid I have to make A change in my schedule.
  • Page:
  • 1
Time to create page: 0.19 seconds
ned_nhra Jrdragsterlogo sm




©2000-2014 ESTA Safety Park Dragstrip
Box 1189 - Cicero, NY 13039

Website Design and Maintenance by Extreme Exposures

summit